At Marwest our relationship and service to our clients are priorities. Each project is as different as the client, and our broad experience and service offerings ensures each client receives a complete solution for their needs.

A few of the clients Marwest is proud to work with

Distribution Services

System Betterment Project


Client:AltaGas Utilities Inc.
  
Date:April 2014 to November 2015
Scope of  Work:Nine individual project scopes, including various pipe mains and service replacement throughout rural and urban areas within Alberta. The work generally required directional drilling to minimize community and environmental impact.

Fortis Mains and Services


Client:Fortis BC Energy Inc
  
Date:Over 40 years, current contract 2012 – Ongoing
Scope:Preferred Contractor for ongoing installation and maintenance work for FortisBC since 1967.

Pipeline Replacement Projects

Oliver-Grand Forks KP 120 273MM Transmission Pipeline Replacement


Client:Fortis BC Energy Inc
  
Date:June to September 2016
Scope:The complete installation of approximately 3720 m of 273 mm, 6.4 mm WT, Grade 359, FBE coated, triple random, sweet natural gas pipeline

 

Williams Lake Pipeline Replacement


Client:Fortis BC Energy Inc
Partnerships:Williams Lake Indian Band and Soda Creek First Nations
  
Date:August 2015 to September 2015
Scope:Replace a section of the existing 114mm transmission pressure (6619 kPa maximum operating pressure) pipeline in the Williams Lake, B.C. area, on a 70% slope

Highland Valley Mill Optimization Project


Client:Teck Highland Valley Copper Partnership
  
Date:May 2013 to January 2014
Scope:Installation of new 42” carbon steel pipe and 48” HDPE from the existing Booster Station #2 (including tie-ins to the existing system) to the Raw Water Reservoir for approximately 6,900 meters.

Gateway SF2/ SF5 Pipeline Reinstatement


Client:Fortis BC Energy Inc
  
Date:June 2012 to June 2013
Scope:Installed 4.1 kilometers of 24-inch and 36-inch HP NG pipeline as part of the construction of the South Fraser Perimeter Road project. Work included grading, de-watering, water treatment (44.7 million gallons), installation of pipelines, creek crossings, road crossings, pipe, remove tie-ins and reinstatement of R/Ws and drainage appliances. Project also involved installation and removal of 80,000 tones of preload and access roads.

Pipeline Integrity and Maintenance

Pembina


Client:Pembina West Limited Partnership
Partnerships:Skeetchestn Natural Resources Corporation
  
Date:2015 and 2016
Scope:Pipeline integrity digs on the 12” Taylor-Kamloops (STN 4-7) Dig program

Spectra


Client:Surerus, OMH
Partnerships:Skeetchestn Natural Resources Corporation
  
Date:2016
Scope:Provision of support equipment and labour, integrity dig, and cable replacement

Other Recent Projects

Greenhills


Client:Teck Resources Limited
  
Date:May to July 2015
Scope:Supply and installation of 20 inch dewatering pipeline to carry water from the in-pit lake to the top of the Phase 6 Pit and discharge into the Mickelson Creek drainage at the Greenhills Operation.

Line Creek


Client:Teck Resources Limited
  
Date:July 2013 to December 2013
Scope:To install and commission a Natural Gas Pipeline through the Line Creek Operation Canyon to the West Line Creek Selenium Active Water Treatment Facility.

Kelowna Bio Gas


Client:Fortis BC Energy Inc
  
Date:December 2013 to May 2014
Scope:The extraction of bio methane gas from the kelowna land fill that is converted and added to Fortis BC’s natural gas grid. The key to this project’s success was Marwest’s ability to integrate ARC Technologies gasification techology to an economically and environmentally viable product.
Marwest Utility Services Ltd. was founded in 1987, and has grown to become one of the largest gas utility companies in the Interior of British Columbia.

In 2007, Rocky McLeod acquired Marwest and aligned it with Darlen Transport.
1400 Chief Louis Way
Kamloops BC, V2H 1J8
map-markerphonephone-squareenvelopefax